Testnet Roadmap
πΊοΈ Testnet Roadmap¶
The Moosh testnet will evolve through several phases, gradually expanding the scope of validation from basic functionality to long-term system behavior.
Foundation β Internal Validation (Completed)¶
Core contracts and market configurations were validated internally before public access.
This phase established a stable baseline for the protocol, ensuring that fundamental lending mechanics and system invariants operate as intended.
Access β Core Market Flows (Current)¶
The testnet is currently open for validating core lending flows, including:
- Supply
- Borrow
- Repay
- Withdraw
At this stage, the focus is on confirming that fundamental market mechanics operate correctly and that users can interact with the system in a clear and predictable way.
Exposure β Risk Boundaries (Upcoming)¶
Testing will gradually expand toward market stress scenarios, including:
- High utilization environments
- Positions approaching liquidation thresholds
The objective is to observe how the protocol signals, enforces, and responds to risk as market conditions approach critical boundaries.
Reliability β Long-Term System Behavior (Later)¶
As the system stabilizes, the focus shifts from feature validation toward long-term reliability.
Markets will run with fewer parameter changes, allowing long-running positions and sustained usage to reveal how the credit system behaves over time and across different users.